{"id":2370,"date":"2022-02-24T00:00:50","date_gmt":"2022-02-24T00:00:50","guid":{"rendered":"http:\/\/ec2-52-95-249-27.ap-south-1.compute.amazonaws.com:8000\/blog\/?p=2370"},"modified":"2023-12-20T18:16:18","modified_gmt":"2023-12-20T18:16:18","slug":"essential-project-reports-that-every-project-manager-must-look-into","status":"publish","type":"post","link":"http:\/\/ec2-52-95-249-27.ap-south-1.compute.amazonaws.com:8000\/blog\/essential-project-reports-that-every-project-manager-must-look-into\/","title":{"rendered":"5 Essential Project Reports That Every Project Manager Must Look Into"},"content":{"rendered":"<p><span data-contrast=\"none\">A project manager can make an informed <\/span><a href=\"http:\/\/ec2-52-95-249-27.ap-south-1.compute.amazonaws.com:8000\/blog\/how-can-you-make-data-driven-decisions-with-resource-management-software\/\"><span data-contrast=\"none\">decision<\/span><\/a><span data-contrast=\"none\"> if the <\/span><b><span data-contrast=\"none\">right information<\/span><\/b><span data-contrast=\"none\"> is available at the right time. In the dynamic business landscape, a large volume of data is generated every minute. Without actionable insights, neither the stakeholders nor the team members can measure the <\/span><b><span data-contrast=\"none\">project\u2019s performance and progress<\/span><\/b><span data-contrast=\"none\">. Moreover, a lack of information on <\/span><a href=\"http:\/\/ec2-52-95-249-27.ap-south-1.compute.amazonaws.com:8000\/blog\/top-project-metrics-you-need\/\"><span data-contrast=\"none\">project metrics<\/span><\/a><span data-contrast=\"none\"> can further lead to intuitive decision-making, proving it to be very costly and detrimental to <\/span><b><span data-contrast=\"none\">business sustainability<\/span><\/b><span data-contrast=\"none\">.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"none\">Thus, to guarantee success, it\u2019s necessary to <\/span><b><span data-contrast=\"none\">analyze<\/span><\/b><span data-contrast=\"none\"> different project-related parameters as per one\u2019s role and responsibility. But how can one organize all the relevant information and keep everyone updated?<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/p>\n<p><i><span data-contrast=\"none\">The best way to consolidate all facts &amp; figures is through <\/span><\/i><b><i><span data-contrast=\"none\">specific project reports<\/span><\/i><\/b><i><span data-contrast=\"none\">. These reports will allow timely dissemination of project-specific information to everyone involved.<\/span><\/i><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"none\">Although, as a manager, preparing reports may seem like a mundane task, but is <\/span><b><span data-contrast=\"none\">absolutely essential<\/span><\/b><span data-contrast=\"none\"> for the success of the projects.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"none\">This blog highlights the essential project reports that every manager must know and the best practices on how to use them.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"none\">But first, let\u2019s begin with the basics.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/p>\n<p><a href=\"https:\/\/www.saviom.com\/resource-management-software.php\" target=\"_blank\" rel=\"noopener\"><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-12613 fullwidth_img aligncenter\" src=\"http:\/\/ec2-52-95-249-27.ap-south-1.compute.amazonaws.com:8000\/blog\/wp-content\/uploads\/2022\/02\/17_5-Essential-Project-Reports-That-Every-Project-Manager-Must-Look-Into.png\" alt=\"Maximize Your Workforce Potential and Enhance Business Efficiency\" width=\"1195\" height=\"450\" srcset=\"http:\/\/ec2-52-95-249-27.ap-south-1.compute.amazonaws.com:8000\/blog\/wp-content\/uploads\/2022\/02\/17_5-Essential-Project-Reports-That-Every-Project-Manager-Must-Look-Into.png 1195w, http:\/\/ec2-52-95-249-27.ap-south-1.compute.amazonaws.com:8000\/blog\/wp-content\/uploads\/2022\/02\/17_5-Essential-Project-Reports-That-Every-Project-Manager-Must-Look-Into-300x113.png 300w, http:\/\/ec2-52-95-249-27.ap-south-1.compute.amazonaws.com:8000\/blog\/wp-content\/uploads\/2022\/02\/17_5-Essential-Project-Reports-That-Every-Project-Manager-Must-Look-Into-1024x386.png 1024w, http:\/\/ec2-52-95-249-27.ap-south-1.compute.amazonaws.com:8000\/blog\/wp-content\/uploads\/2022\/02\/17_5-Essential-Project-Reports-That-Every-Project-Manager-Must-Look-Into-768x289.png 768w\" sizes=\"(max-width: 1195px) 100vw, 1195px\" \/><\/a><\/p>\n<h2 id=\"1\" class=\"target\">What are project reports?<\/h2>\n<p><span data-contrast=\"none\">Project reports are vital tools within <\/span><a href=\"http:\/\/ec2-52-95-249-27.ap-south-1.compute.amazonaws.com:8000\/blog\/essential-project-management-tips-for-beginners\/\"><span data-contrast=\"none\">project management<\/span><\/a><span data-contrast=\"none\">. They represent a <\/span><b><span data-contrast=\"none\">high-level overview<\/span><\/b><span data-contrast=\"none\"> of the project data in a comprehensive manner. Based on that, managers and decision-makers can identify <\/span><a href=\"http:\/\/ec2-52-95-249-27.ap-south-1.compute.amazonaws.com:8000\/blog\/effective-ways-to-manage-capacity-planning-bottlenecks\/\"><span data-contrast=\"none\">bottlenecks<\/span><\/a><span data-contrast=\"none\"> and variances, if any, and take <\/span><b><span data-contrast=\"none\">timely remedial actions<\/span><\/b><span data-contrast=\"none\">.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"none\">Managers create different reports as per each KPI associated with the project. Additionally, they also prepare some reports at different stages of the project to compare the <\/span><b><span data-contrast=\"none\">planned versus actual scenarios<\/span><\/b><span data-contrast=\"none\">. Overall, these reports serve as an actionable insight that helps maintain the project health index. Now, let\u2019s understand why project reports are essential.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/p>\n<p><a href=\"http:\/\/ec2-52-95-249-27.ap-south-1.compute.amazonaws.com:8000\/blog\/essential-project-management-tips-for-beginners\/\" target=\"_blank\" rel=\"noopener\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-11086 fullwidth_img\" src=\"http:\/\/ec2-52-95-249-27.ap-south-1.compute.amazonaws.com:8000\/blog\/wp-content\/uploads\/2019\/05\/MicrosoftTeams-image-99.jpg\" alt=\"Essential Project Management Tips for Beginners \" width=\"830\" height=\"103\" srcset=\"http:\/\/ec2-52-95-249-27.ap-south-1.compute.amazonaws.com:8000\/blog\/wp-content\/uploads\/2019\/05\/MicrosoftTeams-image-99.jpg 830w, http:\/\/ec2-52-95-249-27.ap-south-1.compute.amazonaws.com:8000\/blog\/wp-content\/uploads\/2019\/05\/MicrosoftTeams-image-99-300x37.jpg 300w, http:\/\/ec2-52-95-249-27.ap-south-1.compute.amazonaws.com:8000\/blog\/wp-content\/uploads\/2019\/05\/MicrosoftTeams-image-99-768x95.jpg 768w\" sizes=\"(max-width: 830px) 100vw, 830px\" \/><\/a><\/p>\n<h2 id=\"2\" class=\"target\">Why is project reporting important?<\/h2>\n<p><span data-contrast=\"none\">First and foremost, without proper and effective project reports, the decision makers will be unable to track it\u2019s progress and predict the <\/span><b><span data-contrast=\"none\">final outcome<\/span><\/b><span data-contrast=\"none\">. As a result, the entire project can come to a tumbling halt due to the<\/span><b><span data-contrast=\"none\"> lack of visibility<\/span><\/b><span data-contrast=\"none\"> of relevant data.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"none\">The project reports are crucial because:<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/p>\n<ul>\n<li data-leveltext=\"%1.\" data-font=\"Calibri\" data-listid=\"1\" aria-setsize=\"-1\" data-aria-posinset=\"1\" data-aria-level=\"1\"><span data-contrast=\"none\">It provides a high-level overview of the project at every stage so that the team leads can <\/span><b><span data-contrast=\"none\">course correct<\/span><\/b><span data-contrast=\"none\"> any deviations.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/li>\n<li data-leveltext=\"%1.\" data-font=\"Calibri\" data-listid=\"1\" aria-setsize=\"-1\" data-aria-posinset=\"2\" data-aria-level=\"1\"><a href=\"http:\/\/ec2-52-95-249-27.ap-south-1.compute.amazonaws.com:8000\/blog\/project-stakeholders-and-how-to-manage-them-efficiently\/\"><span data-contrast=\"none\">Stakeholders<\/span><\/a><span data-contrast=\"none\"> can track the overall <\/span><b><span data-contrast=\"none\">project progress<\/span><\/b><span data-contrast=\"none\"> and compare it with the original plan.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/li>\n<li data-leveltext=\"%1.\" data-font=\"Calibri\" data-listid=\"1\" aria-setsize=\"-1\" data-aria-posinset=\"3\" data-aria-level=\"1\"><span data-contrast=\"none\">It gives a clear picture of what has been achieved for the <\/span><b><span data-contrast=\"none\">cost incurred<\/span><\/b><span data-contrast=\"none\"> at every <\/span><span data-contrast=\"auto\">milestone<\/span><span data-contrast=\"none\">.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/li>\n<\/ul>\n<p><span data-contrast=\"none\">The following section discusses some of the essential project reports that managers should know:<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/p>\n<p><a href=\"https:\/\/www.saviom.com\/ebook-registration.php?callFor=EBOOK&amp;ActionType=BDEBOOK&amp;ArticalTitle=Experience%20The%20Future%20Of%20Resource%20Management%20Software\" target=\"_blank\" rel=\"noopener\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-10266 fullwidth_img\" src=\"http:\/\/ec2-52-95-249-27.ap-south-1.compute.amazonaws.com:8000\/blog\/wp-content\/uploads\/2020\/02\/MicrosoftTeams-image-73.jpg\" alt=\"Experience the Future of Resource Management Software\" width=\"1195\" height=\"450\" srcset=\"http:\/\/ec2-52-95-249-27.ap-south-1.compute.amazonaws.com:8000\/blog\/wp-content\/uploads\/2020\/02\/MicrosoftTeams-image-73.jpg 1195w, http:\/\/ec2-52-95-249-27.ap-south-1.compute.amazonaws.com:8000\/blog\/wp-content\/uploads\/2020\/02\/MicrosoftTeams-image-73-300x113.jpg 300w, http:\/\/ec2-52-95-249-27.ap-south-1.compute.amazonaws.com:8000\/blog\/wp-content\/uploads\/2020\/02\/MicrosoftTeams-image-73-1024x386.jpg 1024w, http:\/\/ec2-52-95-249-27.ap-south-1.compute.amazonaws.com:8000\/blog\/wp-content\/uploads\/2020\/02\/MicrosoftTeams-image-73-768x289.jpg 768w\" sizes=\"(max-width: 1195px) 100vw, 1195px\" \/><\/a><\/p>\n<h2 id=\"3\" class=\"target\">Essential project report types for project managers<\/h2>\n<p><span class=\"TextRun SCXW153330014 BCX0\" lang=\"EN-US\" xml:lang=\"EN-US\" data-contrast=\"none\"><span class=\"NormalTextRun SCXW153330014 BCX0\">There are various reports that are created during a <\/span><\/span><a class=\"Hyperlink SCXW153330014 BCX0\" href=\"http:\/\/ec2-52-95-249-27.ap-south-1.compute.amazonaws.com:8000\/blog\/what-is-project-lifecycle-and-how-to-get-it-right\/\" target=\"_blank\" rel=\"noreferrer noopener\"><span class=\"TextRun Underlined SCXW153330014 BCX0\" lang=\"EN-US\" xml:lang=\"EN-US\" data-contrast=\"none\"><span class=\"NormalTextRun SCXW153330014 BCX0\" data-ccp-charstyle=\"Hyperlink\">project\u2019s lifecycle<\/span><\/span><\/a><span class=\"TextRun SCXW153330014 BCX0\" lang=\"EN-US\" xml:lang=\"EN-US\" data-contrast=\"none\"><span class=\"NormalTextRun SCXW153330014 BCX0\"> based on their specific needs. Enlisted below are the seven most important reports:<\/span><\/span><span class=\"EOP SCXW153330014 BCX0\" data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/p>\n<h3>Project status\/health report<\/h3>\n<p><span data-contrast=\"none\">As the name suggests, these reports enable the stakeholders to understand the <\/span><b><span data-contrast=\"none\">project\u2019s overall status<\/span><\/b><span data-contrast=\"none\">. It clarifies whether the project is going as per <\/span><a href=\"http:\/\/ec2-52-95-249-27.ap-south-1.compute.amazonaws.com:8000\/blog\/how-to-create-an-effective-project-plan-in-9-simple-steps\/\"><span data-contrast=\"none\">plan<\/span><\/a><span data-contrast=\"none\"> or there are any <\/span><b><span data-contrast=\"none\">variances<\/span><\/b><span data-contrast=\"none\"> or hiccups in the journey. With these reports, one can review the completed work, the remaining work, <\/span><b><span data-contrast=\"none\">overall completion rate<\/span><\/b><span data-contrast=\"none\">, issues, etc., and take appropriate actions ahead of time.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"none\">Project health\/status reports can be presented to the stakeholders on a weekly, monthly, or quarterly basis. They provide a high-level overview of the project\u2019s course and strengthen the <\/span><b><span data-contrast=\"none\">decision-making process<\/span><\/b><span data-contrast=\"none\">.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/p>\n<h3>Resource metrics report<\/h3>\n<p><span data-contrast=\"none\">Resource metrics reports provide <\/span><b><span data-contrast=\"none\">pertinent information<\/span><\/b><span data-contrast=\"none\"> related to the project teams and different members. One can gather data regarding which resources are working on which tasks, whether they are over\/<\/span><a href=\"http:\/\/ec2-52-95-249-27.ap-south-1.compute.amazonaws.com:8000\/blog\/underutilization-of-resources-cues-and-how-to-mitigate-them\/\"><span data-contrast=\"none\">underutilized<\/span><\/a><span data-contrast=\"none\">, etc. Besides, one can also visualize if some of the resources are taking unplanned leaves or taking too much time to complete any task. In that case, one can revise the project plan to <\/span><b><span data-contrast=\"none\">expedite the delivery<\/span><\/b><span data-contrast=\"none\">.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"none\">Based on this report, one can <\/span><span data-contrast=\"auto\">optimize<\/span><span data-contrast=\"none\"> the schedules,<\/span><b><span data-contrast=\"none\"> monitor their productivity<\/span><\/b><span data-contrast=\"none\"> and performance, etc. Also, you can take necessary actions if there is a significant variance in the <\/span><b><span data-contrast=\"none\">expected utilization versus the actual<\/span><\/b><span data-contrast=\"none\">.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/p>\n<p><a href=\"http:\/\/ec2-52-95-249-27.ap-south-1.compute.amazonaws.com:8000\/blog\/top-project-metrics-you-need\/\" target=\"_blank\" rel=\"noopener\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-11087 fullwidth_img\" src=\"http:\/\/ec2-52-95-249-27.ap-south-1.compute.amazonaws.com:8000\/blog\/wp-content\/uploads\/2019\/05\/MicrosoftTeams-image-100.jpg\" alt=\"Top 5 Project Metrics You Need to Use Today \" width=\"830\" height=\"103\" srcset=\"http:\/\/ec2-52-95-249-27.ap-south-1.compute.amazonaws.com:8000\/blog\/wp-content\/uploads\/2019\/05\/MicrosoftTeams-image-100.jpg 830w, http:\/\/ec2-52-95-249-27.ap-south-1.compute.amazonaws.com:8000\/blog\/wp-content\/uploads\/2019\/05\/MicrosoftTeams-image-100-300x37.jpg 300w, http:\/\/ec2-52-95-249-27.ap-south-1.compute.amazonaws.com:8000\/blog\/wp-content\/uploads\/2019\/05\/MicrosoftTeams-image-100-768x95.jpg 768w\" sizes=\"(max-width: 830px) 100vw, 830px\" \/><\/a><\/p>\n<h3>Risk and mitigation report<\/h3>\n<p><span data-contrast=\"none\">A risk report can be considered as a summary of <\/span><b><span data-contrast=\"none\">unforeseen circumstances<\/span><\/b><span data-contrast=\"none\"> that can derail the project, mitigation steps, and the potential impacts those risks can have on <\/span><span data-contrast=\"auto\">budget<\/span><span data-contrast=\"none\">, timeline, and deliverables. It serves as a <\/span><b><span data-contrast=\"none\">communication tool<\/span><\/b><span data-contrast=\"none\"> and helps the stakeholders within the project to ensure continuous <\/span><a href=\"http:\/\/ec2-52-95-249-27.ap-south-1.compute.amazonaws.com:8000\/blog\/enterprise-risk-management-framework-core-components\/\"><span data-contrast=\"none\">risk management<\/span><\/a><span data-contrast=\"none\">.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"none\">In general, risk reports include comprehensive project risk sources, risks statuses, potentials of those risks, distribution of risks across <\/span><span data-contrast=\"auto\">risk categories<\/span><span data-contrast=\"none\">, mitigation strategies applied, etc. As a project manager, having this information makes you better prepared for a <\/span><b><span data-contrast=\"none\">successful project delivery<\/span><\/b><span data-contrast=\"none\">. One can also go through the risk and mitigation report of a previous project and understand the potential risks that can exist within the current one.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/p>\n<h3>Variance\/baseline report<\/h3>\n<p><span data-contrast=\"none\">There are <\/span><b><span data-contrast=\"none\">three essential baselines<\/span><\/b><span data-contrast=\"none\"> for any project. These are the <\/span><a href=\"http:\/\/ec2-52-95-249-27.ap-south-1.compute.amazonaws.com:8000\/blog\/what-is-scope-creep-and-how-to-avoid-it-in-project-management\/\"><span data-contrast=\"none\">scope<\/span><\/a><span data-contrast=\"none\">, cost, and time baseline. A variance\/baseline report helps you <\/span><b><span data-contrast=\"none\">compare<\/span><\/b><span data-contrast=\"none\"> the actuals with the approved baselines. Thus, you can identify the variances and take course-corrective actions when necessary.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"none\">For example, with a budget baseline report, you can compare the <\/span><b><span data-contrast=\"none\">estimated budget<\/span><\/b><span data-contrast=\"none\"> with the actual expense. Following that, you can assess if the project is going as per the budget or exceeding it. In case there is an <\/span><span data-contrast=\"auto\">overrun<\/span><span data-contrast=\"none\">, then you can pinpoint the areas where excess money was spent. Following this, you may communicate with the members, understand the <\/span><b><span data-contrast=\"none\">budget overrun\u2019s root cause<\/span><\/b><span data-contrast=\"none\">, and take necessary actions to control the <\/span><b><span data-contrast=\"none\">financial health<\/span><\/b><span data-contrast=\"none\">.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/p>\n<p><a href=\"http:\/\/ec2-52-95-249-27.ap-south-1.compute.amazonaws.com:8000\/blog\/crucial-benefits-of-earned-value-management\/\" target=\"_blank\" rel=\"noopener\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-11088 fullwidth_img\" src=\"http:\/\/ec2-52-95-249-27.ap-south-1.compute.amazonaws.com:8000\/blog\/wp-content\/uploads\/2019\/05\/MicrosoftTeams-image-2022-02-23T222622.427.jpg\" alt=\"Crucial Benefits of Earned Value Management \" width=\"830\" height=\"103\" srcset=\"http:\/\/ec2-52-95-249-27.ap-south-1.compute.amazonaws.com:8000\/blog\/wp-content\/uploads\/2019\/05\/MicrosoftTeams-image-2022-02-23T222622.427.jpg 830w, http:\/\/ec2-52-95-249-27.ap-south-1.compute.amazonaws.com:8000\/blog\/wp-content\/uploads\/2019\/05\/MicrosoftTeams-image-2022-02-23T222622.427-300x37.jpg 300w, http:\/\/ec2-52-95-249-27.ap-south-1.compute.amazonaws.com:8000\/blog\/wp-content\/uploads\/2019\/05\/MicrosoftTeams-image-2022-02-23T222622.427-768x95.jpg 768w\" sizes=\"(max-width: 830px) 100vw, 830px\" \/><\/a><\/p>\n<h3>Board\/Executives report<\/h3>\n<p><span data-contrast=\"none\">Board\/executive reports would be used by the <\/span><b><span data-contrast=\"none\">upper management<\/span><\/b><span data-contrast=\"none\"> or the <\/span><b><span data-contrast=\"none\">C-level<\/span><\/b><span data-contrast=\"none\"> executives for decision-making. Since the board members do not have much time on their plate, these reports need not have a <\/span><b><span data-contrast=\"none\">granular representation<\/span><\/b><span data-contrast=\"none\"> of the whole project. Instead, they should comprise high-level information relevant to the executives.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/p>\n<p><i><span data-contrast=\"none\">Board\/executive reports include critical information such as budget positions, milestone progress, etc. They are either documented in graphs or other pictorial representations to make them <\/span><\/i><b><i><span data-contrast=\"none\">crisp<\/span><\/i><\/b><i><span data-contrast=\"none\"> and <\/span><\/i><b><i><span data-contrast=\"none\">easily understandable<\/span><\/i><\/b><i><span data-contrast=\"none\">.<\/span><\/i><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"none\">The following section will explain how you can create these project reports.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/p>\n<h2 id=\"4\" class=\"target\">Best ways to create project reports<\/h2>\n<p><span class=\"TextRun SCXW29366693 BCX0\" lang=\"EN-US\" xml:lang=\"EN-US\" data-contrast=\"none\"><span class=\"NormalTextRun SCXW29366693 BCX0\">Let\u2019s consider that you are heading a project and want your business\/data analysts to prepare reports for you. Here is the rundown of the ways through which they can create them effectively:<\/span><\/span><span class=\"EOP SCXW29366693 BCX0\" data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/p>\n<h3>Centralize project-specific data<\/h3>\n<p><span class=\"TextRun SCXW200187675 BCX0\" lang=\"EN-US\" xml:lang=\"EN-US\" data-contrast=\"none\"><span class=\"NormalTextRun SCXW200187675 BCX0\">You need to maintain a <\/span><\/span><span class=\"TextRun SCXW200187675 BCX0\" lang=\"EN-US\" xml:lang=\"EN-US\" data-contrast=\"none\"><span class=\"NormalTextRun SCXW200187675 BCX0\">single repository<\/span><\/span><span class=\"TextRun SCXW200187675 BCX0\" lang=\"EN-US\" xml:lang=\"EN-US\" data-contrast=\"none\"><span class=\"NormalTextRun SCXW200187675 BCX0\"> to accumulate all the data from the different departments and then make consolidated reports. Without a centralized platform, it will be challenging to procure reports as you may have to <\/span><\/span><a class=\"Hyperlink SCXW200187675 BCX0\" href=\"http:\/\/ec2-52-95-249-27.ap-south-1.compute.amazonaws.com:8000\/blog\/5-ways-to-improve-collaboration-between-departments\/\" target=\"_blank\" rel=\"noreferrer noopener\"><span class=\"TextRun Underlined SCXW200187675 BCX0\" lang=\"EN-US\" xml:lang=\"EN-US\" data-contrast=\"none\"><span class=\"NormalTextRun SCXW200187675 BCX0\" data-ccp-charstyle=\"Hyperlink\">communicate<\/span><\/span><\/a><span class=\"TextRun SCXW200187675 BCX0\" lang=\"EN-US\" xml:lang=\"EN-US\" data-contrast=\"none\"><span class=\"NormalTextRun SCXW200187675 BCX0\"> with other teams for relevant data regularly. This process will be cumbersome and time-consuming. Moreover,<\/span><\/span><span class=\"TextRun SCXW200187675 BCX0\" lang=\"EN-US\" xml:lang=\"EN-US\" data-contrast=\"none\"><span class=\"NormalTextRun SCXW200187675 BCX0\"> siloed information<\/span><\/span><span class=\"TextRun SCXW200187675 BCX0\" lang=\"EN-US\" xml:lang=\"EN-US\" data-contrast=\"none\"><span class=\"NormalTextRun SCXW200187675 BCX0\"> can result in mistakes and inaccuracies, making it imperative to unify the data.<\/span><\/span><span class=\"EOP SCXW200187675 BCX0\" data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/p>\n<p><a href=\"http:\/\/ec2-52-95-249-27.ap-south-1.compute.amazonaws.com:8000\/blog\/how-can-you-make-data-driven-decisions-with-resource-management-software\/\" target=\"_blank\" rel=\"noopener\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-11089 fullwidth_img\" src=\"http:\/\/ec2-52-95-249-27.ap-south-1.compute.amazonaws.com:8000\/blog\/wp-content\/uploads\/2019\/05\/MicrosoftTeams-image-2022-02-24T001836.028.jpg\" alt=\"Make Data-Driven Decisions With Resource Management Software\" width=\"830\" height=\"103\" srcset=\"http:\/\/ec2-52-95-249-27.ap-south-1.compute.amazonaws.com:8000\/blog\/wp-content\/uploads\/2019\/05\/MicrosoftTeams-image-2022-02-24T001836.028.jpg 830w, http:\/\/ec2-52-95-249-27.ap-south-1.compute.amazonaws.com:8000\/blog\/wp-content\/uploads\/2019\/05\/MicrosoftTeams-image-2022-02-24T001836.028-300x37.jpg 300w, http:\/\/ec2-52-95-249-27.ap-south-1.compute.amazonaws.com:8000\/blog\/wp-content\/uploads\/2019\/05\/MicrosoftTeams-image-2022-02-24T001836.028-768x95.jpg 768w\" sizes=\"(max-width: 830px) 100vw, 830px\" \/><\/a><\/p>\n<h3>Create a reporting schedule<\/h3>\n<p><span class=\"TextRun SCXW262557861 BCX0\" lang=\"EN-US\" xml:lang=\"EN-US\" data-contrast=\"none\"><span class=\"NormalTextRun SCXW262557861 BCX0\">Just like the project or the <\/span><\/span><a class=\"Hyperlink SCXW262557861 BCX0\" href=\"http:\/\/ec2-52-95-249-27.ap-south-1.compute.amazonaws.com:8000\/blog\/how-to-perfect-resource-scheduling-techniques-within-project-planning\/\" target=\"_blank\" rel=\"noreferrer noopener\"><span class=\"TextRun Underlined SCXW262557861 BCX0\" lang=\"EN-US\" xml:lang=\"EN-US\" data-contrast=\"none\"><span class=\"NormalTextRun SCXW262557861 BCX0\" data-ccp-charstyle=\"Hyperlink\">resource schedule<\/span><\/span><\/a><span class=\"TextRun SCXW262557861 BCX0\" lang=\"EN-US\" xml:lang=\"EN-US\" data-contrast=\"none\"><span class=\"NormalTextRun SCXW262557861 BCX0\">, a <\/span><\/span><span class=\"TextRun SCXW262557861 BCX0\" lang=\"EN-US\" xml:lang=\"EN-US\" data-contrast=\"none\"><span class=\"NormalTextRun SCXW262557861 BCX0\">reporting calendar<\/span><\/span><span class=\"TextRun SCXW262557861 BCX0\" lang=\"EN-US\" xml:lang=\"EN-US\" data-contrast=\"none\"><span class=\"NormalTextRun SCXW262557861 BCX0\"> or timeline will help you create relevant reports from time to time and form a <\/span><\/span><span class=\"TextRun SCXW262557861 BCX0\" lang=\"EN-US\" xml:lang=\"EN-US\" data-contrast=\"none\"><span class=\"NormalTextRun SCXW262557861 BCX0\">cadence<\/span><\/span><span class=\"TextRun SCXW262557861 BCX0\" lang=\"EN-US\" xml:lang=\"EN-US\" data-contrast=\"none\"><span class=\"NormalTextRun SCXW262557861 BCX0\">. Moreover, with a proper schedule, everyone will know when to expect the reports or updates. The senior management can even book <\/span><span class=\"NormalTextRun ContextualSpellingAndGrammarErrorV2Themed SCXW262557861 BCX0\">slots<\/span><span class=\"NormalTextRun SCXW262557861 BCX0\"> for these <\/span><\/span><span class=\"TextRun SCXW262557861 BCX0\" lang=\"EN-US\" xml:lang=\"EN-US\" data-contrast=\"auto\"><span class=\"NormalTextRun SCXW262557861 BCX0\">meetings<\/span><\/span><span class=\"TextRun SCXW262557861 BCX0\" lang=\"EN-US\" xml:lang=\"EN-US\" data-contrast=\"none\"><span class=\"NormalTextRun SCXW262557861 BCX0\"> to avoid any delays and make <\/span><\/span><span class=\"TextRun SCXW262557861 BCX0\" lang=\"EN-US\" xml:lang=\"EN-US\" data-contrast=\"none\"><span class=\"NormalTextRun SCXW262557861 BCX0\">timely decisions<\/span><\/span><span class=\"TextRun SCXW262557861 BCX0\" lang=\"EN-US\" xml:lang=\"EN-US\" data-contrast=\"none\"><span class=\"NormalTextRun SCXW262557861 BCX0\"> to keep the project on track.<\/span><\/span><span class=\"EOP SCXW262557861 BCX0\" data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/p>\n<h3>Analyze and infer the data<\/h3>\n<p><span class=\"TextRun SCXW24924522 BCX0\" lang=\"EN-US\" xml:lang=\"EN-US\" data-contrast=\"none\"><span class=\"NormalTextRun SCXW24924522 BCX0\">Creating the report is not enough; one must <\/span><\/span><span class=\"TextRun SCXW24924522 BCX0\" lang=\"EN-US\" xml:lang=\"EN-US\" data-contrast=\"none\"><span class=\"NormalTextRun SCXW24924522 BCX0\">understand<\/span><\/span><span class=\"TextRun SCXW24924522 BCX0\" lang=\"EN-US\" xml:lang=\"EN-US\" data-contrast=\"none\"><span class=\"NormalTextRun SCXW24924522 BCX0\"> every data element. Besides, one should also ensure that the data you have gathered from various sources is relevant and <\/span><\/span><span class=\"TextRun SCXW24924522 BCX0\" lang=\"EN-US\" xml:lang=\"EN-US\" data-contrast=\"none\"><span class=\"NormalTextRun SCXW24924522 BCX0\">not out of date<\/span><\/span><span class=\"TextRun SCXW24924522 BCX0\" lang=\"EN-US\" xml:lang=\"EN-US\" data-contrast=\"none\"><span class=\"NormalTextRun SCXW24924522 BCX0\">. Thus, one should analyze and make <\/span><span class=\"NormalTextRun ContextualSpellingAndGrammarErrorV2Themed SCXW24924522 BCX0\">sense out<\/span><span class=\"NormalTextRun SCXW24924522 BCX0\"> of every bit of the data procured. Only then can you present the <\/span><\/span><span class=\"TextRun SCXW24924522 BCX0\" lang=\"EN-US\" xml:lang=\"EN-US\" data-contrast=\"none\"><span class=\"NormalTextRun SCXW24924522 BCX0\">final output<\/span><\/span><span class=\"TextRun SCXW24924522 BCX0\" lang=\"EN-US\" xml:lang=\"EN-US\" data-contrast=\"none\"><span class=\"NormalTextRun SCXW24924522 BCX0\"> you have concluded to the senior management.<\/span><\/span><span class=\"EOP SCXW24924522 BCX0\" data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/p>\n<p><a href=\"http:\/\/ec2-52-95-249-27.ap-south-1.compute.amazonaws.com:8000\/blog\/project-stakeholders-and-how-to-manage-them-efficiently\/\" target=\"_blank\" rel=\"noopener\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-11090 fullwidth_img\" src=\"http:\/\/ec2-52-95-249-27.ap-south-1.compute.amazonaws.com:8000\/blog\/wp-content\/uploads\/2019\/05\/MicrosoftTeams-image-2022-02-24T002147.885.jpg\" alt=\"Who are Project Stakeholders and How to Manage Them Efficiently? \" width=\"830\" height=\"103\" srcset=\"http:\/\/ec2-52-95-249-27.ap-south-1.compute.amazonaws.com:8000\/blog\/wp-content\/uploads\/2019\/05\/MicrosoftTeams-image-2022-02-24T002147.885.jpg 830w, http:\/\/ec2-52-95-249-27.ap-south-1.compute.amazonaws.com:8000\/blog\/wp-content\/uploads\/2019\/05\/MicrosoftTeams-image-2022-02-24T002147.885-300x37.jpg 300w, http:\/\/ec2-52-95-249-27.ap-south-1.compute.amazonaws.com:8000\/blog\/wp-content\/uploads\/2019\/05\/MicrosoftTeams-image-2022-02-24T002147.885-768x95.jpg 768w\" sizes=\"(max-width: 830px) 100vw, 830px\" \/><\/a><\/p>\n<h3>Formulate report as per the audience<\/h3>\n<p><span class=\"TextRun SCXW78179214 BCX0\" lang=\"EN-US\" xml:lang=\"EN-US\" data-contrast=\"none\"><span class=\"NormalTextRun SCXW78179214 BCX0\">The nature of reports differs according to the <\/span><\/span><span class=\"TextRun SCXW78179214 BCX0\" lang=\"EN-US\" xml:lang=\"EN-US\" data-contrast=\"none\"><span class=\"NormalTextRun SCXW78179214 BCX0\">audience<\/span><\/span><span class=\"TextRun SCXW78179214 BCX0\" lang=\"EN-US\" xml:lang=\"EN-US\" data-contrast=\"none\"><span class=\"NormalTextRun SCXW78179214 BCX0\"> reviewing them. Since most of the reports will be created for the clients and the senior management, they need not be very technical. One must keep them compact with bullet points, visuals, and <\/span><\/span><span class=\"TextRun SCXW78179214 BCX0\" lang=\"EN-US\" xml:lang=\"EN-US\" data-contrast=\"none\"><span class=\"NormalTextRun SCXW78179214 BCX0\">avoid jargon<\/span><\/span><span class=\"TextRun SCXW78179214 BCX0\" lang=\"EN-US\" xml:lang=\"EN-US\" data-contrast=\"none\"><span class=\"NormalTextRun SCXW78179214 BCX0\"> wherever possible. However, the reports need to be much more comprehensive for the team members. Thus, you need to <\/span><\/span><span class=\"TextRun SCXW78179214 BCX0\" lang=\"EN-US\" xml:lang=\"EN-US\" data-contrast=\"none\"><span class=\"NormalTextRun SCXW78179214 BCX0\">customize the reports<\/span><\/span><span class=\"TextRun SCXW78179214 BCX0\" lang=\"EN-US\" xml:lang=\"EN-US\" data-contrast=\"none\"><span class=\"NormalTextRun SCXW78179214 BCX0\"> to cater to specific audiences.<\/span><\/span><span class=\"EOP SCXW78179214 BCX0\" data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/p>\n<h3>Keep it open for comments<\/h3>\n<p><span class=\"TextRun SCXW256522738 BCX0\" lang=\"EN-US\" xml:lang=\"EN-US\" data-contrast=\"none\"><span class=\"NormalTextRun SCXW256522738 BCX0\">Project reports shouldn\u2019t be just <\/span><\/span><span class=\"TextRun SCXW256522738 BCX0\" lang=\"EN-US\" xml:lang=\"EN-US\" data-contrast=\"none\"><span class=\"NormalTextRun SCXW256522738 BCX0\">static documents<\/span><\/span><span class=\"TextRun SCXW256522738 BCX0\" lang=\"EN-US\" xml:lang=\"EN-US\" data-contrast=\"none\"><span class=\"NormalTextRun SCXW256522738 BCX0\"> that contain facts. Rather they should encourage conversations between the people involved in the project. Stakeholders or team members should be able to understand the reports and provide <\/span><\/span><a class=\"Hyperlink SCXW256522738 BCX0\" href=\"http:\/\/ec2-52-95-249-27.ap-south-1.compute.amazonaws.com:8000\/blog\/proven-ways-to-give-constructive-feedback-to-your-employees\/\" target=\"_blank\" rel=\"noreferrer noopener\"><span class=\"TextRun Underlined SCXW256522738 BCX0\" lang=\"EN-US\" xml:lang=\"EN-US\" data-contrast=\"none\"><span class=\"NormalTextRun SCXW256522738 BCX0\" data-ccp-charstyle=\"Hyperlink\">feedback<\/span><\/span><\/a><span class=\"TextRun SCXW256522738 BCX0\" lang=\"EN-US\" xml:lang=\"EN-US\" data-contrast=\"none\"><span class=\"NormalTextRun SCXW256522738 BCX0\"> and insights. <\/span><\/span><span class=\"TextRun SCXW256522738 BCX0\" lang=\"EN-US\" xml:lang=\"EN-US\" data-contrast=\"none\"><span class=\"NormalTextRun SCXW256522738 BCX0\">Communicative project reports<\/span><\/span><span class=\"TextRun SCXW256522738 BCX0\" lang=\"EN-US\" xml:lang=\"EN-US\" data-contrast=\"none\"><span class=\"NormalTextRun SCXW256522738 BCX0\"> allow you to find the best possible solution for addressing any given issue. The structure of the report can be modified as per the feedback.<\/span><\/span><span class=\"EOP SCXW256522738 BCX0\" data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/p>\n<p><a href=\"http:\/\/ec2-52-95-249-27.ap-south-1.compute.amazonaws.com:8000\/blog\/why-project-communication-skills-are-important-and-how-to-master-them\/\" target=\"_blank\" rel=\"noopener\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-11091 fullwidth_img\" src=\"http:\/\/ec2-52-95-249-27.ap-south-1.compute.amazonaws.com:8000\/blog\/wp-content\/uploads\/2019\/05\/MicrosoftTeams-image-2022-02-24T002434.659.jpg\" alt=\"Why Project Communication Skills Are Important and How to Master Them? \" width=\"830\" height=\"103\" srcset=\"http:\/\/ec2-52-95-249-27.ap-south-1.compute.amazonaws.com:8000\/blog\/wp-content\/uploads\/2019\/05\/MicrosoftTeams-image-2022-02-24T002434.659.jpg 830w, http:\/\/ec2-52-95-249-27.ap-south-1.compute.amazonaws.com:8000\/blog\/wp-content\/uploads\/2019\/05\/MicrosoftTeams-image-2022-02-24T002434.659-300x37.jpg 300w, http:\/\/ec2-52-95-249-27.ap-south-1.compute.amazonaws.com:8000\/blog\/wp-content\/uploads\/2019\/05\/MicrosoftTeams-image-2022-02-24T002434.659-768x95.jpg 768w\" sizes=\"(max-width: 830px) 100vw, 830px\" \/><\/a><\/p>\n<h3>Apply visuals for better comprehension<\/h3>\n<p><span data-contrast=\"none\">A <\/span><b><span data-contrast=\"none\">text-heavy report<\/span><\/b><span data-contrast=\"none\"> may seem boring to some people. At the same time, the senior management won\u2019t have time to glance through every word in the reports and understand the information. Thus, you should include illustrations, graphs, charts, etc., wherever possible to make the reports <\/span><b><span data-contrast=\"none\">visually appealing<\/span><\/b><span data-contrast=\"none\"> and more understandable.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"none\">With these techniques, you can create informative reports that take care of the different aspects of project management.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/p>\n<h2 id=\"5\" class=\"target\">Conclusion<\/h2>\n<p><span data-contrast=\"none\">Project reports are <\/span><b><span data-contrast=\"none\">vital components<\/span><\/b><span data-contrast=\"none\"> of a project. They help communicate relevant and timely information to key stakeholders, strengthen decision-making, and ultimately, ensure the <\/span><b><span data-contrast=\"none\">successful delivery of projects<\/span><\/b><span data-contrast=\"none\">.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"none\">The reports mentioned above serve all these purposes, and thus, managers must get a clear understanding of them.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/p>\n<h2 id=\"6\" class=\"target\">The Glossary<\/h2>\n<p><a href=\"http:\/\/ec2-52-95-249-27.ap-south-1.compute.amazonaws.com:8000\/blog\/the-complete-glossary-of-resource-or-workforce-planning-scheduling-and-management\/\" target=\"_blank\" rel=\"noopener\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-11092 fullwidth_img\" src=\"http:\/\/ec2-52-95-249-27.ap-south-1.compute.amazonaws.com:8000\/blog\/wp-content\/uploads\/2019\/05\/MicrosoftTeams-image-31.png\" alt=\"the glossary \" width=\"1040\" height=\"250\" srcset=\"http:\/\/ec2-52-95-249-27.ap-south-1.compute.amazonaws.com:8000\/blog\/wp-content\/uploads\/2019\/05\/MicrosoftTeams-image-31.png 1040w, http:\/\/ec2-52-95-249-27.ap-south-1.compute.amazonaws.com:8000\/blog\/wp-content\/uploads\/2019\/05\/MicrosoftTeams-image-31-300x72.png 300w, http:\/\/ec2-52-95-249-27.ap-south-1.compute.amazonaws.com:8000\/blog\/wp-content\/uploads\/2019\/05\/MicrosoftTeams-image-31-1024x246.png 1024w, http:\/\/ec2-52-95-249-27.ap-south-1.compute.amazonaws.com:8000\/blog\/wp-content\/uploads\/2019\/05\/MicrosoftTeams-image-31-768x185.png 768w\" sizes=\"(max-width: 1040px) 100vw, 1040px\" \/><\/a><\/p>\n<h2 id=\"7\" class=\"target\">SAVIOM Solution<\/h2>\n<p>SAVIOM has over 20 years of experience helping multinational clients manage their <a href=\"https:\/\/www.saviom.com\/resource-management-software.php\" target=\"_blank\" rel=\"noopener\">resources efficiently and effectively<\/a>. With over 20 years of experience, this Australian-based MNC has a global presence across 50 countries and has helped 100+ clients meet their specific business goals. Saviom also provides tools for <a href=\"https:\/\/www.saviom.com\/project-portfolio-management-software.php\" target=\"_blank\" rel=\"noopener\">project portfolio management<\/a>, <a href=\"https:\/\/www.saviom.com\/professional-service-automation.php\" target=\"_blank\" rel=\"noopener\">professional service automation<\/a>, and <a href=\"https:\/\/www.saviom.com\/workforce-planning-software.php\" target=\"_blank\" rel=\"noopener\">workforce planning software<\/a>. So, SAVIOM can help your business to establish an efficient system geared towards your specific business challenges.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>A project manager can make an informed decision if the right information is available at the right time. In the dynamic business landscape, a large volume of data is generated every minute. Without actionable insights, neither the stakeholders nor the team members can measure the project\u2019s performance and progress. Moreover, a lack of information on [&hellip;]<\/p>\n","protected":false},"author":5,"featured_media":17062,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[37],"tags":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v21.1 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>5 Project Reports That Every Project Manager Must Look Into<\/title>\n<meta name=\"description\" content=\"This blog highlights the essential project reports that every manager must know and the best practices on how to use them.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"http:\/\/ec2-52-95-249-27.ap-south-1.compute.amazonaws.com:8000\/blog\/project-management\/essential-project-reports-that-every-project-manager-must-look-into\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"5 Essential Project Reports That Every Project Manager Must Look Into\" \/>\n<meta property=\"og:description\" content=\"This blog highlights the essential project reports that every manager must know and the best practices on how to use them.\" \/>\n<meta property=\"og:url\" content=\"http:\/\/ec2-52-95-249-27.ap-south-1.compute.amazonaws.com:8000\/blog\/project-management\/essential-project-reports-that-every-project-manager-must-look-into\/\" \/>\n<meta property=\"og:site_name\" content=\"Resources Library\" \/>\n<meta property=\"article:published_time\" content=\"2022-02-24T00:00:50+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2023-12-20T18:16:18+00:00\" \/>\n<meta property=\"og:image\" content=\"http:\/\/ec2-52-95-249-27.ap-south-1.compute.amazonaws.com:8000\/blog\/wp-content\/uploads\/2022\/02\/MicrosoftTeams-image-2022-03-16T134208.395.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"628\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Mahendra Gupta\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:title\" content=\"5 Essential Project Reports That Every Project Manager Must Look Into\" \/>\n<meta name=\"twitter:image\" content=\"http:\/\/ec2-52-95-249-27.ap-south-1.compute.amazonaws.com:8000\/blog\/wp-content\/uploads\/2022\/02\/MicrosoftTeams-image-2022-03-16T134208.395.png\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Mahendra Gupta\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"http:\/\/ec2-52-95-249-27.ap-south-1.compute.amazonaws.com:8000\/blog\/project-management\/essential-project-reports-that-every-project-manager-must-look-into\/\",\"url\":\"http:\/\/ec2-52-95-249-27.ap-south-1.compute.amazonaws.com:8000\/blog\/project-management\/essential-project-reports-that-every-project-manager-must-look-into\/\",\"name\":\"5 Project Reports That Every Project Manager Must Look Into\",\"isPartOf\":{\"@id\":\"http:\/\/ec2-52-95-249-27.ap-south-1.compute.amazonaws.com:8000\/blog\/#website\"},\"datePublished\":\"2022-02-24T00:00:50+00:00\",\"dateModified\":\"2023-12-20T18:16:18+00:00\",\"author\":{\"@id\":\"http:\/\/ec2-52-95-249-27.ap-south-1.compute.amazonaws.com:8000\/blog\/#\/schema\/person\/363ad412d3216940f49f43339e52883b\"},\"description\":\"This blog highlights the essential project reports that every manager must know and the best practices on how to use them.\",\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"http:\/\/ec2-52-95-249-27.ap-south-1.compute.amazonaws.com:8000\/blog\/project-management\/essential-project-reports-that-every-project-manager-must-look-into\/\"]}]},{\"@type\":\"WebSite\",\"@id\":\"http:\/\/ec2-52-95-249-27.ap-south-1.compute.amazonaws.com:8000\/blog\/#website\",\"url\":\"http:\/\/ec2-52-95-249-27.ap-south-1.compute.amazonaws.com:8000\/blog\/\",\"name\":\"Resources Library\",\"description\":\"Saviom\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"http:\/\/ec2-52-95-249-27.ap-south-1.compute.amazonaws.com:8000\/blog\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"http:\/\/ec2-52-95-249-27.ap-south-1.compute.amazonaws.com:8000\/blog\/#\/schema\/person\/363ad412d3216940f49f43339e52883b\",\"name\":\"Mahendra Gupta\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"http:\/\/ec2-52-95-249-27.ap-south-1.compute.amazonaws.com:8000\/blog\/#\/schema\/person\/image\/\",\"url\":\"http:\/\/ec2-52-95-249-27.ap-south-1.compute.amazonaws.com:8000\/blog\/wp-content\/uploads\/2023\/08\/Mahendra-gupta.jpg\",\"contentUrl\":\"http:\/\/ec2-52-95-249-27.ap-south-1.compute.amazonaws.com:8000\/blog\/wp-content\/uploads\/2023\/08\/Mahendra-gupta.jpg\",\"caption\":\"Mahendra Gupta\"},\"url\":\"http:\/\/ec2-52-95-249-27.ap-south-1.compute.amazonaws.com:8000\/blog\/author\/mahendra-gupta\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"5 Project Reports That Every Project Manager Must Look Into","description":"This blog highlights the essential project reports that every manager must know and the best practices on how to use them.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"http:\/\/ec2-52-95-249-27.ap-south-1.compute.amazonaws.com:8000\/blog\/project-management\/essential-project-reports-that-every-project-manager-must-look-into\/","og_locale":"en_US","og_type":"article","og_title":"5 Essential Project Reports That Every Project Manager Must Look Into","og_description":"This blog highlights the essential project reports that every manager must know and the best practices on how to use them.","og_url":"http:\/\/ec2-52-95-249-27.ap-south-1.compute.amazonaws.com:8000\/blog\/project-management\/essential-project-reports-that-every-project-manager-must-look-into\/","og_site_name":"Resources Library","article_published_time":"2022-02-24T00:00:50+00:00","article_modified_time":"2023-12-20T18:16:18+00:00","og_image":[{"width":1200,"height":628,"url":"http:\/\/ec2-52-95-249-27.ap-south-1.compute.amazonaws.com:8000\/blog\/wp-content\/uploads\/2022\/02\/MicrosoftTeams-image-2022-03-16T134208.395.png","type":"image\/png"}],"author":"Mahendra Gupta","twitter_card":"summary_large_image","twitter_title":"5 Essential Project Reports That Every Project Manager Must Look Into","twitter_image":"http:\/\/ec2-52-95-249-27.ap-south-1.compute.amazonaws.com:8000\/blog\/wp-content\/uploads\/2022\/02\/MicrosoftTeams-image-2022-03-16T134208.395.png","twitter_misc":{"Written by":"Mahendra Gupta","Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"http:\/\/ec2-52-95-249-27.ap-south-1.compute.amazonaws.com:8000\/blog\/project-management\/essential-project-reports-that-every-project-manager-must-look-into\/","url":"http:\/\/ec2-52-95-249-27.ap-south-1.compute.amazonaws.com:8000\/blog\/project-management\/essential-project-reports-that-every-project-manager-must-look-into\/","name":"5 Project Reports That Every Project Manager Must Look Into","isPartOf":{"@id":"http:\/\/ec2-52-95-249-27.ap-south-1.compute.amazonaws.com:8000\/blog\/#website"},"datePublished":"2022-02-24T00:00:50+00:00","dateModified":"2023-12-20T18:16:18+00:00","author":{"@id":"http:\/\/ec2-52-95-249-27.ap-south-1.compute.amazonaws.com:8000\/blog\/#\/schema\/person\/363ad412d3216940f49f43339e52883b"},"description":"This blog highlights the essential project reports that every manager must know and the best practices on how to use them.","inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["http:\/\/ec2-52-95-249-27.ap-south-1.compute.amazonaws.com:8000\/blog\/project-management\/essential-project-reports-that-every-project-manager-must-look-into\/"]}]},{"@type":"WebSite","@id":"http:\/\/ec2-52-95-249-27.ap-south-1.compute.amazonaws.com:8000\/blog\/#website","url":"http:\/\/ec2-52-95-249-27.ap-south-1.compute.amazonaws.com:8000\/blog\/","name":"Resources Library","description":"Saviom","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"http:\/\/ec2-52-95-249-27.ap-south-1.compute.amazonaws.com:8000\/blog\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"},{"@type":"Person","@id":"http:\/\/ec2-52-95-249-27.ap-south-1.compute.amazonaws.com:8000\/blog\/#\/schema\/person\/363ad412d3216940f49f43339e52883b","name":"Mahendra Gupta","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"http:\/\/ec2-52-95-249-27.ap-south-1.compute.amazonaws.com:8000\/blog\/#\/schema\/person\/image\/","url":"http:\/\/ec2-52-95-249-27.ap-south-1.compute.amazonaws.com:8000\/blog\/wp-content\/uploads\/2023\/08\/Mahendra-gupta.jpg","contentUrl":"http:\/\/ec2-52-95-249-27.ap-south-1.compute.amazonaws.com:8000\/blog\/wp-content\/uploads\/2023\/08\/Mahendra-gupta.jpg","caption":"Mahendra Gupta"},"url":"http:\/\/ec2-52-95-249-27.ap-south-1.compute.amazonaws.com:8000\/blog\/author\/mahendra-gupta\/"}]}},"_links":{"self":[{"href":"http:\/\/ec2-52-95-249-27.ap-south-1.compute.amazonaws.com:8000\/blog\/wp-json\/wp\/v2\/posts\/2370"}],"collection":[{"href":"http:\/\/ec2-52-95-249-27.ap-south-1.compute.amazonaws.com:8000\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/ec2-52-95-249-27.ap-south-1.compute.amazonaws.com:8000\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/ec2-52-95-249-27.ap-south-1.compute.amazonaws.com:8000\/blog\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"http:\/\/ec2-52-95-249-27.ap-south-1.compute.amazonaws.com:8000\/blog\/wp-json\/wp\/v2\/comments?post=2370"}],"version-history":[{"count":10,"href":"http:\/\/ec2-52-95-249-27.ap-south-1.compute.amazonaws.com:8000\/blog\/wp-json\/wp\/v2\/posts\/2370\/revisions"}],"predecessor-version":[{"id":17565,"href":"http:\/\/ec2-52-95-249-27.ap-south-1.compute.amazonaws.com:8000\/blog\/wp-json\/wp\/v2\/posts\/2370\/revisions\/17565"}],"wp:featuredmedia":[{"embeddable":true,"href":"http:\/\/ec2-52-95-249-27.ap-south-1.compute.amazonaws.com:8000\/blog\/wp-json\/wp\/v2\/media\/17062"}],"wp:attachment":[{"href":"http:\/\/ec2-52-95-249-27.ap-south-1.compute.amazonaws.com:8000\/blog\/wp-json\/wp\/v2\/media?parent=2370"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/ec2-52-95-249-27.ap-south-1.compute.amazonaws.com:8000\/blog\/wp-json\/wp\/v2\/categories?post=2370"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/ec2-52-95-249-27.ap-south-1.compute.amazonaws.com:8000\/blog\/wp-json\/wp\/v2\/tags?post=2370"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}